Aerofit IT9301 [17/26] 页面 17

Превью страниц Страница 17 / 26
Aerofit IT9301 [17/26] 页面 17
17
AssemblyAssembly
STEP 6
1. Attach the Cable (#22) to the Top Plate (#15).
2. Attach two 4.5" Pulley (#21) to the Weight Stack Frame (#1) using:
two M10*50 HHB (#85) four Φ1120*2 Flat Washer (#70)
two M10 Nylon lock Nut (#77)
3. Attach one 4.5" Pulley (#21) to the Weight Stack Frame (#1) using:
two Pulley Cover (#67) one M10*50 SHCS (#94)
one M10 Nylon lock Nut (#77)
4. Attach one 4.5" Pulley (#21) to the Main Frame (#2) using:
one Pulley Cover (#67) one M10*50 SHCS (#94)
one Φ11*Φ20*2 Flat Washer (#70) one M10 Nylon lock Nut (#77)
5. Attach one 4.5" Pulley (#21) to the Main Frame (#2) using:
one M10*50 HHB (#85) two Φ11*Φ20*2 Flat Washer (#70)
one M10 Nylon lock Nut (#77)
6. Attach one 4.5" Pulley (#21) to the Sway Pulley Bracket (#8) using:
one M10*50 HHB (#85) two Φ11*Φ20*2 Flat Washer (#70)
one M10 Nylon lock Nut (#77)
7. Attach the Cable (#22) to the Main Frame (#2) using:
one M10*50 HHB (#85) two Φ24*Φ18*Φ11*9 Spacer (#25)
one Φ10*Φ14*20 Spacer (#53) one Cable End (#41)
one M10 Nylon lock Nut (#77)
Note: Wrench Tighten Βolts and Nylon Lock nuts.
Скачать