Daikin ACEF4AV1-H [20/64] Operation of the unit

Daikin ACEF4AV1-C [20/64] Operation of the unit
Operation of The Unit SiE-64
14 Field Setting
2. Operation of The Unit
2.1 How to Operate The Unit
Before attempting to use the unit, plug the power cable into a single phase 220-240V socket.
The buttons and their functions are explained below.
Illustration
Si-64.book Page 14 Monday, June 18, 2001 2:57 PM

Содержание

Скачать