Daikin ACEF4AV1-H [52/64] Installation of power cable

Daikin ACEF4AV1-H [52/64] Installation of power cable
In Case of ACEF4AV1-(C)(H) SiE-64
46 Removal Procedure
1.7 Installation of Power Cable
Procedure Warning Be sure to turn off all power supplies before disassembling work
Step Procedure Points
1 Insert cord bushing to the
hole at front side of main
body.
2 Adjust the bushing position
in order to insert back panel
into groove of cord bushing
before install back panel.
3 Installation of power cable is
complete.
Si-64.book Page 46 Monday, June 18, 2001 2:57 PM

Содержание

Скачать