Daikin FTX35JV1NB9 [129/162] Removal of pc board and switch box

Daikin FTK35JVET9 [129/162] Removal of pc board and switch box
For RK25J, RK35J, RX25J, RX35J Si04-115
120 Removal Procedure
2.3 Removal of PC Board and Switch Box
Procedure Warning Be sure to turn off all power supplies at least 10 min. before
disassembling work.
Step Procedure Points
1. Remove the shelter.
"
The shelter has five hooks.
"
Be sure to avoid forgetting to
restore the shelter and to
avoid loosing or damaging it.
1
Undo the five hooks
and remove the shelter.
2. Remove the printed circuit
board.
1
Disconnect the ground
wire.

Содержание

Скачать