Daikin LRMEQ5AY1 [142/156] Maintenance

Daikin LRMEQ20AY1E [142/156] Maintenance
SiENBE28-901 Troubleshooting
Air Cooled Refrigeration Condensing Unit 141
6.7 Maintenance
1. Procedure for Removal of Parts from Refrigerant System
As the results of checking a malfunction, if the malfunction results from part(s) used in the
refrigerant system, remove the part(s) referring to the procedure for refrigerant recovery
shown below.
If liquid refrigerant was recovered, add refrigeration oil according to the following criteria.
Refrigeration oil brand: Idemitsu DAPHNE FVC68D
Amount to be added: Volume of recovered refrigerant (kg) x 0.05 liter
(Example: If the volume of the refrigerant recovered is 24kg, 24 x 0.05 = 1.2 liter of oil that
should be added.)
Fill port: Liquid stop valve service port
For details about adding oil, see the section that describes the refrigeration oil
procedure.
Location of malfunction Procedure for maintenance
1
Outdoor unit compressors (M1C, M2C and M3C)
Solenoid valves (for STD1 and STD2)
INV electronic expansion valve
Four way valve
High pressure switches
Refer to Maintenance 1.
2
Main electronic expansion valve
Injection electronic expansion valve
Refer to Maintenance 2.
3
Secondary equipment, such as a showcase
Dryer
Refer to Maintenance 3.
4
High pressure sensor
Low pressure sensor
A check valve allows it to be
removed and replaced without any
refrigerant recovery.

Содержание

Скачать