Daikin FLY35GV1NB [23/67] 15 defrosting operation heat pump model only

Daikin FLY35GV1NB [23/67] 15 defrosting operation heat pump model only
SiE-84
Service Manual 15
(15) Defrosting Operation
(* Heat Pump Model Only)
At the time of heating, defrosting starts when the outdoor heat exchanger temperature becomes lower than the defrosting
start temperature, and defrosting is cancelled when it becomes higher than the cancelling temperature.
Change in the outdoor temperature is detected to prevent useless defrosting to change the defrosting start temperature.
1. When the outdoor temperature is at 0° C : defrosting starts at the defrosting start at the defrosting start standard
temperature.
2. When the outdoor temperature lowers by 1° C from 0° C, the defrosting start temperature is lowered by 1° C from the
standard temperature
3. When the outdoor temperature rises by 1° C from 0° C, the defrosting start temperature is raised by 1° C from the
standard temperature.
4. The defrosting start temperature changes within the range of - 3° C ~ - 15.5° C.
Defrosting is not made during a period of the following guard time.
1. For 35 minutes of compressor operation integrating time after the start of operation and after the end of defrosting.
2. For 5 minutes after the start of the compressor.
The compressor should be stopped to make a switching to lower the switching noise of the 4-way valve.
Defrosting is cancelled after the lapse of defrosting time of 10 minutes even if the standard temperature is lower than the
defrosting-cancelling temperature.
Note)
Standard temperature varies according to each model.
(-3˚ C ~ -6˚ C)
Time Chart
Note)
*1 : Buffer time for countermeasures to four-way valve switching noise.
Completion of defrost condition
Heating operation
Defrosting operation Heating operation
Compressor
4 way valve
Outdoor fan
Capacity control
valve
Pressure equalizing
valve
90 seconds
2 seconds
Less than 10 minutes
60
seconds
2 seconds
SIE2-84.book Page 15 Wednesday, May 30, 2001 10:29 AM