Daikin RMXS112E8V1B Сервис мануал онлайн [141/393] 604226

Daikin RMXS112E8V1B Сервис мануал онлайн [141/393] 604226
Test Operation SiBE18-821
128 Test Operation
5. When charging is complete, determine the weight of refrigerant that was added and fill in the
amount in the "Additional refrigerant charge label" attached to service precautions plate on
the unit.
6. After adding the refrigerant, do not forget to close the lid of the service port. The tightening
torque for the lid is 11.5~13.9 N•m.
1. Service port for adding refrigerant
2. Liquid line stop valve
3. Gas line stop valve
4. Pipe fixing plate
1
2
3
2
4
3
V1 Y1

Содержание

Скачать