SiBE18-821 Troubleshooting for Outdoor Unit
Troubleshooting 303
Troubleshooting
Check No.01
Refer to P.346
NO
YES
YES
YES
Are the
three points above
OK?
Does the
stop due to malfunction
(E3) recur?
NO
Is the HPS
operating value normal
(i.e., 4.0MPa)?
NO
YES
Are the
characteristics of the high
pressure sensor normal?
(See *1.)
NO
YES
Is the
pressure detected
with the PCB normal?
(See *2.)
NO
Check for the points shown below.
Is the stop valve open?
Is the HPS connector properly connected to the
main PCB?
Does the high pressure switch have continuity?
· Mount a pressure gauge on the high-pressure
service port.
· Connect the Service Checker.
· Reset the operation using the remote controller,
and then restart the operation.
· The high pressure sensor is normal, and the pressure detected with the PCB is also normal.
· The high pressure has really become high.
Check No.01 Referring to information on page 346, remove the causes by which the high
pressure has become high.
High
pressure
sensor
+5V
(4)
(3)
(2)
(1)
Rectify defective points, if any.
Replace the HPS.
Replace the high pressure sensor.
Replace the main PCB.
*1: Make a comparison between the voltage of the pressure sensor and that read by the
pressure gauge.
*3: Make measurement of voltage of the pressure sensor.
*2: Make a comparison between the high pressure value checked with the Service Checker
and the voltage of the pressure sensor (see *1).
(As to the voltage of the pressure sensor, make measurement of voltage at the connector,
and then convert it to pressure according to information on page 351.)
Connector for high
pressure sensor (Red)
Micro controller
A/D input
Make measurement of DC
voltage between these wires.
Red
Black
White
Caution
Be sure to turn off power switch before connect or disconnect connector,
or parts damage may be occurred.
(Q0551)