Daikin EHSXB08P50BA [28/84] Connection assignment circuit board a1p

Daikin EHSXB08P50BA [28/84] Connection assignment circuit board a1p
Installation and operating instructions
28
Daikin Altherma EHS(X/H)
Daikin Altherma integrated solar unit
008.1441399_02 – 01/2021 – EN
4 x Set-up and installation
4.5.2 Position of the circuit boards
1 Control housing
2 Control panel
3 Control section of the control
Fig. 4-17 Overview circuit boards (internal housing)
4.5.3 Connection assignment, circuit board A1P
The A1P circuit board comes pre-connected to the unit. No as-
sembly or connection work is necessary on the A1P circuit board!
Fig. 4-18 Circuit board A1P (basic control of the heat pump)
4.5.4 Terminal assignment for the RTX-EHS circuit
board
Fig. 4-19 Circuit board RTX-EHS (Backup-Heater) - see section 4.5.12

Содержание

Скачать