Daikin EHYHBH05AFV32 [40/252] Preparation

Daikin EHYHBX08AFV3 [40/252] Preparation
6 | Preparation
Installer reference guide
40
EVLQ05+08CAV3 + EHYHBH05AF + EHYHBH/X08AF + EHYKOMB33AA
Daikin Altherma hybrid heat pump
4P355634-1F – 2020.10
6 Preparation
6.1 Overview: Preparation
This chapter describes what you have to do and know before going on-site.
It contains information about:
Preparing the installation site
Preparing the refrigerant piping
Preparing the water piping
Preparing the electrical wiring
6.2 Preparing the installation site
Do NOT install the unit in places often used as work place. In case of construction
works (e.g. grinding works) where a lot of dust is created, the unit MUST be
covered.
Choose an installation location with sufficient space for carrying the unit in and out
of the site.
6.2.1 Installation site requirements of the outdoor unit
INFORMATION
Also read the following requirements:
General installation site requirements. See the "General safety precautions"
chapter.
Refrigerant piping requirements (length, height difference). See further in this
"Preparation" chapter.
Mind the following spacing guidelines:
≤1200
>250
>250
>250
>350
>350
(mm)(mm)
a
b
b
a
a Air outlet
b Air inlet
NOTICE
Do NOT stack the units on each other.
Do NOT hang the unit on a ceiling.
Strong winds (≥18km/h) blowing against the outdoor unit’s air outlet causes short
circuit (suction of discharge air). This may result in:
deterioration of the operational capacity;
frequent frost acceleration in heating operation;