Daikin EHYHBH05AFV32 [96/252] Installation

Daikin EHYHBX08AFV3 [96/252] Installation
7 | Installation
Installer reference guide
96
EVLQ05+08CAV3 + EHYHBH05AF + EHYHBH/X08AF + EHYKOMB33AA
Daikin Altherma hybrid heat pump
4P355634-1F – 2020.10
NOTICE
Wiring is different for a NC (normally closed) valve and a NO (normally open) valve.
X2M
X1M
7
5
6
X5M
X2M
X1M
X5M
NO
NC
M2S M2S
7
6
5
2 Fix the cable with cable ties to the cable tie mountings.
7.11.11 To connect the electrical meter
INFORMATION
In case of an electricity meter with transistor output, check the polarity. The positive
polarity MUST be connected to X5M/7; the negative polarity to X5M/8.
1 Connect the electrical meters cable to the appropriate terminals as shown in
the illustration below.
X1M
7
8
X5M
S2S
2 Fix the cable with cable ties to the cable tie mountings.

Содержание

Похожие устройства

Скачать