Yamaha SUPER TENERE XTZ750 [218/425] Engine assembly and adjustment

Содержание

ENGINE ASSEMBLY AND ADJUSTMENT ENG 3 Align Bolt head T with connecting rod cap 4 Tighten Nuts connecting rods ACAUTION ______________________ Tighten to full torque specification pausing Apply continuous torque 4 6 and 4 8 m kg Once you reach DO NOT STOP TIGHTENING unitl que is reached If the tightening is i ed between 4 6 and 4 8 m kg loose to less than 4 6 m kg and start again Nut connecting rod 48 Nm 4 8 m kg 35 ft lb VALVES AND CAMSHAFTS 1 Deburr Valve stem end Use an oil storne to smooth the stem 2 Apply Molybdenum disulfide motor oil onto valve stem and oil seal s3 4 52 Install Valve j Spring seat 2 Oil seal 3 Valve spring 4 Valve retainer 5 into cylinder head