Yamaha SUPER TENERE XTZ750 [244/425] Engine assembly and adjustment

Содержание

ENGINE ASSEMBLY AND ADJUSTMENT ENG 14 Install Chain tensioner T Installing steps Remove the cap bolt 2 washer 3 4 and collar 5 Release the ratchet 6 and push the rod 7 install the chain tensioner with the rat facing downward Tighten the bolts Bolts chain tensioner 10 Nm 1 0 m kg 7 2 ft lb Install the collar 5 springs 4 wash and cap bolt 2 X Cap bolt timing chain tensi 20 Nm 2 0 m kg 14 ft lb 15 Tighten Bolts cam sprockets Bolts cam sprockets 24 Nm 2 4 m kg 17 ft lb 16 Install Chain guide g upper Bolts chain guide 10 Nm 1 0 m kg 7 2 ft lb 17 Check Valve timing Out of alignment Adjust Refer to above steps 13 16 18 Check Valve clearance Out of specification Adjust Refer to VALVE CLEARANCE AD MENT section in the CHAPTER 3 Intake valve cold 0 15 0 20 mm 0 006 0 008 in Exhaust valve cold 0 25 0 30 mm 0 010 0 012 in