Airedale OptiChill OPC 500 [57/60] Chillers optichill

Airedale OptiChill OPC 500 [57/60] Chillers optichill
Chillers OPTICHILL
Chillers
Installation & Maintenance : 6564868 08/2008
57
Maintenance
GENERAL MAINTENANCE
6 MONTHS ACTION NOTES
Repeat 3 month checks plus the following:
SYSTEM
Check evaporator heater and low ambient
thermostat are set to activate at 4.0ºC.
Remember to re-cap the Schrader
connections!
12 MONTHS ACTION NOTES
Repeat 6 month checks plus the following:
SYSTEM
Check safety devices cut out the compressor at the
correct settings.
Check glycol concentration if appropriate. Adjust as necessary.
REFRIGERATION
Leak test all refrigerant joins and inspect all
water connections.
Rectify as necessary.
ELECTRICAL
Tighten all electrical terminals.
Periodic maintenance and inspection of this equipment is necessary to prevent premature
failure, the following periodic inspections should be carried out by period or hourly use
which ever is sooner.
1 Year Measure compressor motor insulation.
7,500 Hours or 4 Years Inspect compressor oil.
COMPRESSOR
MAINTENANCE
20,000 Hours or 4 Years Inspect oil filter, suction filter, check valve and pressure-
relief valve.
For periods of winter shut down the following precautions are recommended:
SHUT DOWN PERIODS
Close the liquid and discharge ball valve
Cap service ports
Turn off electrical circuits
Drain the water from the chiller evaporator via the evaporator drain plug

Содержание

Похожие устройства

Скачать