Emotron CDU/CDX 48-026 [25/82] Commissioning

Emotron CDU/CDX 48-026 [25/82] Commissioning
EMOTRON DSV 5445/5444
21.04.09 Emotron
Page 25
6 Commissioning
6.1 Operation of FU-Control
FC-Control
All is OK
Rdy to switch on
R
RW
keys
0147_01e.drw
Reset
BB A9
RS232
RS485
transducer
plug on the left side of the unit!
potentiometer for display contrast
The converter performs self-test of the hardware and associated peripherals (mains phases, motor
thermistors and rotary encoders…) during the initialisation phase.
The following messages appear on the FU-Control display for a short time and signify the following:
Display message Meaning of the display message
Switch power ON: EMOTRON LIFT CENTER
FUC 2.1 11.07.07
Initialisation phase: Converter performs a
self-test.
WAITING FOR STATUS
WAITING FOR ERRORS
Initialisation phase: Converter performs
self-test of peripherals.
All OK
Pulse lock-out
If this message appears in the display, the
converter cannot detect any faults.
The parameters and variables
must be loaded before they can be
altered.
Press UP button:
t
Please note that data entries may be
made at FU-Control only when no drive
command is present. TIP: Switch
controller to recovery.
Starting to read
Pulse lock-out
Reading data
Pulse lock-out
FU-Control now reads all necessary
parameters from the converter
Alter variables
Change
Reading completed.

Содержание

Скачать