Eaton Powerware EX EXB 1000/1500 RT2U [16/200] Installation

Eaton Powerware EX 1500 RT2U [16/200] Installation
34008097EN/AE - Page 14
2. Installation
HotSwap MBP-module operation
UPS start-up with the HotSwap MBP module
1 - Check that the UPS is correctly connected to the HotSwap MBP module.
2 - Set switch (53) to the Normal position.
3 - Start the UPS by pressing the ON/OFF button (27) on the UPS control panel.
The load is supplied by the UPS.
LED (51) "UPS ON - OK to switch" on the HotSwap MBP module goes ON.
HotSwap MBP-module test
1 - Set switch (53) to the Bypass position and check that the load is still supplied.
2 - Set switch (53) back to the Normal position.
2.8 UPS connection without a FlexPDU or HotSwap MBP module
The HotSwap MBP module has a rotary
switch (53) with two positions:
Normal - the load is supplied by the UPS,
Bypass - the load is supplied directly by
the AC-power source.
Check that the indications on the name plate located on the back of the UPS correspond to the AC-power source
and the true electrical consumption of the total load.
Tower model
1 - Connect the UPS socket (9) to the AC-
power source using the power cable from
the equipments to be protected.
2 - Connect the loads to the UPS using the
cables (32).
It is preferable to connect the priority loads
to the 3 outlets marked (8) and the non-
priority loads to the 3 outlets marked (7)
that can be programmed in pairs (1 and 2).
To program the outlets, the EATON
communications software is required.
RT model
Note. The UPS charges the battery as soon as it is connected to the AC-power source, even if button (27) is not
pressed.
Once the UPS is connected to the AC-power source, eight hours of charging are required before the battery can
supply the rated backup time.
By-pass
Normal
UPS ON -
OK to switch
BY PASS SWITCH
51
52 53
9
8
7
32
9
7
8
32
34008097EN_AE.fm Page 14 Lundi, 1. décembre 2008 4:31 16