Daikin EKHTSU260AC [83/292] Turn power on

Daikin EKHTSU260AC [83/292] Turn power on
ESIE09-08B Test Operation
Test Operation 71
1.1.2 Turn Power On
Turn outdoor unit power on .
Turn indoor unit p ower on .
(V3056)
Be sure to turn the power on 6 hours before starting operation to
protect compressors.
Close outside panels of the outdoor unit.
Wait until initialization period is over (up to 12 min).
(Can be known by checking leds on outdoor PCB - see “Field
Settings from Outdoor unit” for details.
Car ry out the test run as
desc ribed in the installation
manual of the indoor unit
Carry out field setting, if
necessary

Содержание

Скачать