STATUS UniOne CP 125 07410501 [10/72] Operation

STATUS UniOne CP 125 07410501 [10/72] Operation
10
TOOL PARTS OVERVIEW
OPERATION
EN
TOOL PARTS OVERVIEW
OPERATION
The manufacturer shall not be liable for any changes made to the tool nor for any
damage resulting from such changes.
Power tools must not be used outdoors in rainy weather, or in moist environment
(after rain) or in close vicinity with easily ammable liquids and gases. The working
place should be well lit.
PRIOR TO INITIAL OPERATION
Always inspect the blade. Use only well grinded blades. Never use blades with cracks
and indents or HSS-blades.
Check if the blade is tightened reliably and moves freely.
Check if the mobile guard moves freely.
Make sure the work piece or the material is well secured.
Let the machine operate at no load for 30 seconds. Replace the blade in case vibrations
are observed.
REPLACING THE BLADE
Press the spindle lock button (21). Whilst depressing the spindle lock button (21) using
the blade hex key delivered with the machine, turn bolt (4)
anti-clockwise. Remove the
blade bolt (4) and the outer blade ange (3).
Ensure blade anges and bolt is clean of sawdust, grease, etc.
Move the lower blade lever (12), to lift the lower guard (20) toward the upper blade
guard (6). While performing this step check the proper functioning of the lower guard
spring.
1. Blade
3. Outer blade ange
3a. Inner blade ange (not shown)
4. Blade bolt
5. Base plate
6. Upper immobile blade guard
7. Dust extraction tube
8. Back handle
9. ON/OFF switch
10. Motor
12. Blade guard lever
13. Depth adjustment scale
14. Depth adjustment lever
15. Parallel guide
18. Cutting guide notch 45º
19. Cutting guide notch 90º
20. Mobile blade guard
21. Spindle lock button
22. Lock-o button
23. Bevel scale
24. Bevel adjustment xing
25. Battery release button
26. Battery
27. Battery state indicator
28. Charger
29. Battery state check button

Содержание

Похожие устройства

Скачать