Test Operation SiBE311209
131 Test Operation
1.2.2 Turn Power ON
Turn outdoor unit, function unit
and indoor unit power ON.
Check the LED display of the
outdoor unit PCB.
Make the field settings with
outdoor unit PCB.
{
Be sure to turn the power ON 6 hours before starting operation to protect
compressors. (to power on crankcase heater)
{
Check to be sure the transmission is normal.
The transmission is normal if the LEDs display conditions as shown in
table below.
() The master unit is the outdoor unit to which the transmission wiring for
the indoor units is connected.
The other outdoor units are slave units.
{ Make the field settings if needed.
(For the setting procedure, refer to information in "3.2. Field Setting from
Outdoor Unit" on P.162 onward.)
For the outdoor-multi system, make the field settings with the master unit.
(Field settings made with the slave unit will be all invalid.)
LED display
k
: ON
h
: OFF
l
: Blinking
LED display
(Default status
before delivery)
One outdoor unit installed
Multiple
outdoor unit
system ()
Master
Slave
Micro-
computer
operation
monitor
MODE
TEST
COOL / HEAT select
IND
MASTER
SLAVE
Low
noise
Demand
Multi
HAP H1P
H2P H3P
H4P
H5P H6P H7P
H8P
l
l
l
h
h
h
h
h
h
k
k
h
h
h
h
h
h
h
h
h
h
h
h
h
h
k
l
or
h
(Reference)
<RTSYQ10PA>
Switch box
Outdoor unit Function unit
<RTSYQ14 · 16PA>
Switch box
Outdoor unit Function unit
<RTSYQ20PA>
Switch
box
Outdoor unit 1
(Master or slave)
Outdoor unit 2
(Master or slave)
Function unit