Daikin EKHVMYD50ABV1 [23/64] Inspecting handling and unpacking the unit

Daikin EKHVMYD50ABV1 [23/64] Inspecting handling and unpacking the unit
EKHVMRD50+80ABV1 + EKHVMYD50+80ABV1
Daikin Altherma indoor unit
4P404420-1 2015.04
Installation manual
21
Service space of the unit
7.3. Inspecting, handling and unpacking the unit
At delivery, the unit must be checked and any damage must be
reported immediately to the carrier's claims agent.
Bring the unit as close as possible to its nal installation position
in its original package to prevent damage during transport.
Unpack the indoor unit completely according to the instructions
mentioned on the unpacking instructions sheet.
Check if all indoor unit accessories (see "4. Accessories" on
page 4) are enclosed.
7.4. Installing the unit
Preparation before installation on nal installation place
After unpacking the unit and before installing the unit on its nal
installation position, following preparations need to be done:
Open the unit
Refer to the "5.1. Opening the unit" on page 4.
Knock out the needed knockout holes.
This installation instruction consists of installation of
refrigerant piping,
water piping and
electrical wiring.
For each of these a dedicated knock out hole is foreseen at the
backside of the unit:
To punch a knockout hole, punch it with a hammer, remove all
burrs and install the supplied grommets (see "4. Accessories" on
page 4).
Before installation of the unit to its nal position, it is advised to
connect the water exible pipes and refrigerant pipes to the unit
(delivered as accessory).
A Space required for switch box removal
B Left installation (top view)
C Right installation (top view)
D Space required for wiring (in case of right installation)
WARNING
Tear apart and throw away plastic packaging bags so that
children will not play with them. Children playing with
plastic bags face danger of death by suffocation.
D
>500
>600
A
B
>250
C
>250
30
NOTE
Installation shall be done by an installer, the choice of
materials and installation shall comply with the
applicable legislation. In Europe the EN378 is the
applicable standard that shall be used.
1 Knock out hole for refrigerant piping
2 Knock out hole for electrical wiring
3 Knock out hole for water piping
A Left installation
B Right installation
Knockout holes are foreseen at both sides of the
unit. Pay attention to knock out the correct holes
depending on your installation location.
Refrigerant piping and water piping must go
through different knockout holes.
The electrical wiring must always enter the unit at
the upper knockout holes at the left side of the
unit (see the gure above).
Do NOT use the lower knockout holes.
1 Knockout hole
2 Burr
3 Grommet
4 Putty or insulation materials (eld supply)
1
3
2
1
3
AB
12 3 4

Содержание

Скачать