8.5. Routing
Take out the switchbox and put it in front of the unit and open the
switchbox cover. Refer to "7.1. Selecting an installation location" on
page 18.
Route the wires into the unit as follows:
To avoid electric noise problems, be sure that cables are put in the
correct bundle as mentioned on the gure.
Be sure to x the cable with cable ties to the cable tie mountings to
ensure strain relief and to make sure that it does not come in contact
with the piping and sharp edges.
8.6. Connection
Use the appropriate cables, connect the power supply, multi tenant
power supply, and communication cable(s) to the appropriate
terminals as shown below.
Refer also to the wiring diagram for further details.
For the connections of optional PCB's please refer to the respective
installation manual.
NOTE
When installing eld supply or option cables, always
make sure that the switchbox is placed before the unit.
This will make it possible to remove the switchbox
easily during service.
CAUTION
Do not push or place redundant cable length in the unit.
PS
LV
HV
HV
LV
PS
LV
HV
PS
LV
HV+PS
LV HV
PS
LV
PS
HV
1 Power supply
2 Multi tenant power supply
3 Transmission wiring
4 User interface wiring
5 Stress relief
WARNING
The length of the conductors between the power supply
stress relief and the terminal block itself must be such that
the current-carrying wires are tautened before the earth
wire is in case the power supply is pulled loose from the
stress relief.
2
5 5
4
3
5
1