Daikin RMXS140E8V1B [143/393] Check operation

Daikin RMXS140E8V1B [143/393] Check operation
Test Operation SiBE18-821
130 Test Operation
1.1.9 Check Operation
* During check operation, mount front panel to avoid the misjudging.
* Check operation is mandatory for normal unit operation.
(When the check operation is not executed, alarm code "U3" will be displayed.)
On completion of test operation, LED on outdoor unit PC board displays the following.
H3P ON: Normal completion
H2P ON: Abnormal completion
Check the indoor unit remote controller for abnormal
display and correct it.
Malfunction code
In case of an alarm code displayed on remote controller:
Check on operation
(Q0379)
Set to setting mode 1 (H1P LED is
OFF). (Refer to "Setting mode 1"
on page 136.
Press and hold the TEST
OPERATION button (BS4) on
outdoor unit PC board for 5
seconds.
{ The test operation is started automatically.
The following judgements are conducted within 15 minutes(about 30
minutes at the maximum).
2“Check for wrong wiring”
2“Check stop valve for not open”
2“Check for refrigerant charge”
The following indications are conducted while in test operation.
2LED lamp on outdoor unit PC board H2P Blinks (test operation)
2Remote controller Indicates “ ” (during centralized control) on
upper right.
Indicates “ ” (test operation) on lower left
(Only for SkyAir)
Malfunction
code
Nonconformity during installation Remedial action
E3
The stop valves in the outdoor unit remain closed.
Open the stop valve on both the gas side and liquid side.
E4
F3
The stop valves in the outdoor unit remain closed.
Open the stop valve on both the gas side and liquid side.
The operation mode on the remote controller
was changed before the check run.
Set the operating mode on all indoor unit remote controllers to
“cooling”.
The refrigerant is insufficient.
Check whether additional refrigerant charge has been finished
correctly.
Calculate again the required quantity of refrigerant to be
charged based on the piping length, then charge additionally
proper quantity of refrigerant.
U2 Insufficient supply voltage Check if the supply voltage is supplied properly.
U3 The check operation is not performed. Perform the check operation.
U4 The power is not supplied to the outdoor unit. Connect correctly the power cable of the outdoor unit.
UA
Improper type of indoor units or BP units are
connected.
Check the type of indoor units and BP units currently connected.
If they are not proper, replace them with proper ones.
UF
The stop valves in the outdoor unit remain closed.
Open the stop valve on both the gas side and liquid side.
The piping and wiring of the specified indoor unit
are not connected correctly to the outdoor unit.
Confirm that the piping and wiring of the specified indoor unit are
connected correctly to the outdoor unit.
The operation mode on the remote
controller was changed before the check
operation.
Set the operating mode on all indoor unit remote controllers to
“cooling”.
UH
The unit-to-unit wirings are not connected
correctly.
Connect correctly the unit-to-unit wirings to the F1 and F2(TO BP
UNIT) terminals on the PC board (A1P) in the outdoor unit.
U1
Power supply cables are connected in the
reverse phase instead of the normal phase.
Connect the power supply cables in normal phase. Change any
two of the three power supply cables (L1, L2, L3) to correct phase.