Daikin FHQ100BUV1B [244/340] Turn the provisional hanger to disengage it from the hook of switch box and slide the decoration panel in the arrow direction to remove the panel

Daikin FHQ100BUV1B [244/340] Turn the provisional hanger to disengage it from the hook of switch box and slide the decoration panel in the arrow direction to remove the panel
Si21-205A FFQ25/35/50/60BV1B
Removal Procedure 233
5
Turn the provisional
hanger to disengage it
from the hook of switch
box, and slide the
decoration panel in the
arrow direction to
remove the panel.
Step
Procedure Points
(S2640)
(S2641)

Содержание

Скачать