D-Link DGS-3212SR [22/224] Section 2

D-Link DGS-3212SR [22/224] Section 2
DGS-3212SR Stackable Gigabit Layer 2 Switch
SECTION 2
Installation
Package Contents
Before You Connect to the Network
Installing the Switch without a Rack
Installing the Switch in a Rack
Connecting Stacked Switch Groups
Configuring a Switch Group for Stacking
External Redundant Power System
Connecting the Console Port
Password Protection
SNMP Settings
IP Address Assignment
Connecting Devices to the Switch
Package Contents
Before you begin installing the Switch, confirm that your package contains the following items:
One DGS-3212SR Layer 3 Switch
One Mounting kit with two mounting brackets and screws
Four rubber feet with adhesive backing
One AC power cord
CLI Reference Manual
This Manual
Before You Connect to the Network
Before you connect to the network, you must install the Switch on a flat surface or in a rack, set up a terminal emulation
program, plug in the power cord, and then set up a password and IP address.
NOTICE: Do not connect the Switch to the network until you have established the
correct IP settings, user accounts and proper stacking configuration (if the Switch
is stacked).
10

Содержание

Похожие устройства

Скачать