Daikin EHYHBX08AFV3 [65/252] Installation

Daikin EHYHBX08AFV3 [65/252] Installation
7 | Installation
Installer reference guide
65
EVLQ05+08CAV3 + EHYHBH05AF + EHYHBH/X08AF + EHYKOMB33AA
Daikin Altherma hybrid heat pump
4P355634-1F – 2020.10
21 3
2 Fix the wall bracket to the wall with 2 M8 bolts.
3 Lift the unit.
30kg
4 Tilt the top of the unit against the wall at the position of the wall bracket.
5 Slide the bracket on the back of the unit over the wall bracket. Make sure the
unit is fixed properly. You can additionally fix the bottom side of the unit with
2 M8 bolts.
6 The unit is mounted to the wall.

Содержание

Скачать