Honda CB900F 919 (2001) [191/432] Supply hoses t

Honda CB900F 919 (2001) [191/432] Supply hoses t
ENGINE REMOVAL/INSTALLATION
- crank pulse generator 2P conn ector
- regulator/rectifier 3P/4P connector
- s
peed
sensor 3P connec
tor
- oil pressure/neutral s
wit
ch 2P connector
- side stand s
wit
ch 2P connector
Install the ignitio n coil caps.
Connect th e PAIR a
ir
supply hoses to
the
reed
valve covers.
P
our
rec
omm
ende
d engine oil up to the proper level
(page 3-12).
Fill the cooling system with recommended coolant
and bleed the air (page 6-4).
DRIVE SPROCKET INSTALLATION
Install
the
drive cha in on to the sprocket.
Install the drive sprocket to the counter shaft w ith the
punch
mark
facing out and align the teeth of the drive
sprocket and counter shaft.
Install the the washer and tighten the special bolt to
the specified torque.
TORQUE: 54
N·m
(5.5 k
qf-m,
40
Ibf·ft)
7-8

Содержание

Похожие устройства

Скачать
Случайные обсуждения