Daikin RXY32MY1 [7/125] At the office see

Daikin RXYQ10M9W1B [7/125] At the office see
Commissioning Manual EM11A021
DCM601A51 intelligent Touch Manager
6
New installation (By using the pre-engineering tool)
At the ofce See:
Prepare various information.
Check the equipment to connect to DIII-NET.
Allocate the Group Address.
Acquire the upgrade data. 4-8 Upgrade
Back up the iTM data.
* In the case of maintenance (When pre-engineering by
using the current settings)
4-9 Backup
Set up management points.
(Pre-engineering tool, spreadsheet such as Microsoft
Excel)
4-7 Pre-engineering
Create the Layout View.
(Layout View creation tool)
* When necessary
Commissioning Manual Supplementary
Volume
Layout View Creation Tool (EM11A024)
Acquiring the Activation key
* When necessary
5-1 Activation
Acquiring the Activation key
At the site
Install the iTM. Installation Manual (EM11A016)
Install the upgrade data. 4-10 Installation
Make basic settings.
(Boot sequence)
Installation Manual (EM11A016)
Set up “Main” and “Sub”. 4-3 DIII-NET Engineering
Install pre-engineering data and Layout View data. 4-10 Installation
Activate optional maker functions.
Enable dealer options.
* When necessary
5-1 Activation
Entering the Activation key
5-2 Dealer Option Setup

Содержание