Daikin RWEYQ26PY1 [112/342] Caution when the 400 volt power supply is applyed to n phase by mistake replace inverter pc board a2p and control transformer t1r t2r in switch box together

Daikin RWEYQ30PY1 [112/342] Caution when the 400 volt power supply is applyed to n phase by mistake replace inverter pc board a2p and control transformer t1r t2r in switch box together
Si30-813 Test Operation
Test Operation 101
k
ON
h
OFF
l
Blink
* The outside unit connected the control wires (F1 and F2) for the indoor unit should be
designated as master unit. The other outside unit not connected the control wires will be slave
unit.
1. When Turning On Power First Time
The unit cannot be run for up to 12 minutes to automatically set the master power and address
(indoor-outside unit address, etc.).
Status
2. When Turning On Power the Second Time and Subsequent
Tap the RESET button on the outside unit PC board. Operation becomes possible for about 2
minutes. If you do not push the RESET button, the unit cannot be run for up to 10 minutes to
automatically set master power.
Status
3. When an Indoor Unit or Outside Unit Has Been Added, or Indoor or Outside Unit PC
Board Has Been Changed
Be sure to push and hold the RESET button for 5 seconds. If not, the addition cannot be
recognized. In this case, the unit cannot be run for up to 12 minutes to automatically set the
address (indoor-outside unit address, etc.)
Status
LED display (Factory set)
Micro
computer
normal
monitor
MODE TEST
CH selection
Low
noise
Demand Multi
IND Master Slave
HAP H1P H2P H3P H4P H5P H6P H7P H8P
1 outside unit installation
lhhkhhhhh
outside unit
multi
installation(*)
master
lhhkhhhhk
slave1
lhhhhhhhl
slave2
lhhhhhhhh
Outside unit Test lamp H2P .... Blinks
Can also be set during operation described above.
Indoor unit If ON button is pushed during operation described above, the “UH”
malfunction indicator blinks.
(Returns to normal when automatic setting is complete.)
Outside unit Test lamp H2P .... Blinks
Can also be set during operation described above.
Indoor unit If ON button is pushed during operation described above, the operation lamp
lights but the compressor does not operate. (Returns to normal when
automatic setting is complete.)
Outside unit Test lamp H2P .... Blinks
Can also be set during operation described above.
Indoor unit If ON button is pushed during operation described above, the “UH” or “U4”
malfunction indicator blinks. (Returns to normal when automatic setting is
complete.)
Caution When the 400 volt power supply is applyed to "N" phase by mistake,
replace Inverter PC board (A2P) and control transformer (T1R, T2R) in
switch box together.