Daikin RWEYQ28PY1 [156/342] After tightening the cap check that no refrigerant leaks are present

Daikin RWEYQ30PY1 [156/342] After tightening the cap check that no refrigerant leaks are present
Si30-813 Field Setting
Test Operation 145
Tightening torque
(Refer to figure below)
Caution
Do not damage the cap sealing.
Always use a charge hose for service port connection.
After tightening the cap, check that no refrigerant leaks are present.
After working, securely tighten the cover of service port without fail by specified torque.
When loosening a flare nut, always use two wrenches in combination. When connecting the
piping, always use a spanner and torque wrench in combination to tighten the flare nut.
When connecting a flare nut, coat the flare (inner and outer faces) with ether oil or ester oil
and hand-tighten the nut 3 to 4 turns as the initial tightening.
Do not forget to open the stop valve before starting operation.
[Operation state]
Compressor frequency : Normal cooling PI control, upper limit 177Hz
Y5S, Y7S, 4 way valve: OFF Y1E, electronic expansion valve : Normal cooling control
Indoor unit expansion valve (All unit) : 1024 pulse Y3E: 0 pls
Indoor unit fan : H tap
Shutoff valve
size
Tightening torque N-m (Turn clockwise to close)
Shaft (valve body)
Cap
(valve lid)
Service port Flare nut
Gas side
accessory
pipe (1)
Liquid side 5.4-6.6
Hexagonal
wrench 4 mm
13.5-16.5 11.5-13.9 32.7-39.9
Gas side 27-33
Hexagonal
wrench 10 mm
36-44 11.5-13.9 22-28