1 Pre-Test Run Checks
1.1 What Is in This Chapter?
Introduction This chapter contains checks you have to carry out before every test run.
Overview This chapter contains the following topics:
Topic See page
1.2–General Checks 4–4
1.3–Water Piping Checks 4–5
1.4–External Static Pressure: EUWAC5FZW1 4–8
1.5–External Static Pressure: EUWA*5-12KZW1 4–10
1.6–External Static Pressure: EUWA*16-24KZW1 4–12
1.7–External Static Pressure: EUWY*5-12KZW1 4–14
1.8–External Static Pressure: EUWY*16-24KZW1 4–16
1.9–Static Pressure of the Pump for EUWA*5-24KZW1 and EUWY*5-24KZW1 4–18
1.10–Motor Pulley Setting: EUWAC8FZW1 4–20
1.11–Motor Pulley Setting EUWAC10FZW1 4–22
1.12–Water Pressure Drop through Evaporator: EUWAC5-8-10FZW1 4–24
1.13–Water Pressure Drop through Evaporator: EUWA*5-12KZW1 4–25
1.14–Water Pressure Drop through Evaporator: EUWA*16-24KZW1 4–27
1.15–Water Pressure Drop through Evaporator: EUWY*5-12KZW1 4–29
1.16–Water Pressure Drop through Evaporator: EUWY*16-24KZW1 4–31
1.17–Setting of the Flow Switch 4–33
1.18–Air fan adjustment 4–35
1.19–Electrical Checks 4–36
1.20–Control of the function of the 4-way valve for EUWY5-24KZW1 4–37