ESIE-0302 Pre-Test Run Checks
Part 4 – Commissioning and Test Run 4–39
3
4
5
1
123456Cause Procedure
Hot Cool Cool as
in
column
2
Hot as in
column
1
Temper-
ature of
valve
body
Hot The pilot valve
works correctly.
There is dirt in
one bleed hole.
1. De-energize the solenoid.
2. Raise the head pressure.
3. Re-energize the solenoid
to loosen the dirt.
4. If the procedure was
unsuccessful:
Remove the valve and
clean it.
Check for air before
reinstalling.
If there is still no
movement: replace the
valve, add a new strainer
to the discharge tube and
mount the valve
horizontally.
The piston cup
head leaks.
1. Stop the unit.
2. After pressure equaliza-
tion, restart with
energized solenoid.
3. If the valve shifts,
retry with the compressor
on.
If there is no reversal,
replace the valve.
Hot Cool Cool as
in
column
2
Hot as in
column
1
Temper-
ature of
valve
body
Temper-
ature of
valve
body
The pilot tubes
are clogged.
1. Raise the head pressure.
2. Operate the solenoid to
free the dirt.
3. If there is still no shift,
replace the valve.
Hot Cool Cool as
in
column
2
Hot as in
column
1
Hot Hot Both parts of the
pilot are still
open.
1. Raise the head pressure.
2. Operate the solenoid to
free the partially clogged
port.
3. If there is still no shift,
replace the valve.
Warm Cool Cool as
in
column
2
Hot as in
column
1
Temper-
ature of
valve
body
Warm The compressor is defective.