Yamaha NEOS 50 YN50 (2002) [25/161] Cable routing

Yamaha NEOS 50 YN50 (2002) [25/161] Cable routing
SPEC
CABLE ROUTING
2-8
Rectifier/Regulator
Main switch
Fuel level measurer
Horn
Ignition coil
Spark plug cable
Oil level sensor
Oil tank
C.D.I.
A Splice the electrical installation to the frame
B Splice the oil pipe to the tank
C Connect the oil pipe to the pump
D Splice the installation to the frame
E Tighten the earth cable and the ignition coil
together
F Pass the speedometer cable through the
guide
G Fit the grommet in the small hole of the
underbracket

Содержание

Скачать