Gigabyte MW70-3S0 (rev. 1.0) [21/135] 21 hardware installation

Gigabyte MW70-3S0 (rev. 1.0) [21/135] 21 hardware installation
- 21 - Hardware Installation
• Whenremovingthecableconnectedtoabackpanelconnector,rstremovethecablefromyour
device and then remove it from the motherboard.
• When removing the cable, pull it straight out from the connector. Do not rock it side to side to
prevent an electrical short inside the cable connector.
Link
Activity LED
Speed LED
10/100/1000 LAN Port
Link/Activity LED:Speed LED:
State Description
Yellow On 1 Gbps data rate
Yellow Blink Identify 1 Gbps data
rate
Green On 100 Mbps data rate
Green Blink Identify 100 Mbps data
rate
Off 10 Mbps data rate
State Description
On Link between system and networ k or no
access
Blinking Data transmission or receiving is occurring
Off No data transmission or receiving is occurring

Содержание

Скачать