Delta Electronics VFD037CH23A-21 [89/638] Conduit box installation

Превью страниц Страница 89 / 638
Delta Electronics VFD550CH23A-00/-21 [89/638] Conduit box installation
Chapter 7 Optional Accessories
7-19
Conduit Box Installation
Frame D
1. Loosen the cover screws and press the tabs on each side of the cover to remove the cover, as shown in the
following figure. Screw torque: 10~12kg-cm (8.66~10.39Ib-in)
2. Remove the 5 screws shown in the following figure. Screw torque: 24~26kg-cm (20.8~22.6Ib-in).
3. Install the conduit box by fasten the 5 screws shown in the following figure.
Screw torque: 24~26kg-cm (20.8~22.6Ib-in).
4. Fasten the 4 screws shown in the following figure. Screw torque: 10~12kg-cm (8.66~10.39Ib-in).

Содержание

1610