Daikin FXSQ32MVE [199/458] Open the valve c see the figure 31 the valve a b and the liquid and gas side shutout valve must be left closed and charge the refrigerant of the additional charging amount from the liquid side shutout valve service port if the additional charging amount was charged fully close the valve c and go to step 5 if the additional charging amount was not charged fully go to step 4

Daikin FXDQ63NBVES [199/458] Open the valve c see the figure 31 the valve a b and the liquid and gas side shutout valve must be left closed and charge the refrigerant of the additional charging amount from the liquid side shutout valve service port if the additional charging amount was charged fully close the valve c and go to step 5 if the additional charging amount was not charged fully go to step 4
Test Operation Si34-803
188 Test Operation
3. Open the valve C (See the figure 31. The valve A, B and the liquid and gas side shutout
valve must be left closed), and charge the refrigerant of the “additional charging amount”
from the liquid side shutout valve service port.
If the “additional charging amount” was charged fully, close the valve C and go to step 5.
If the “additional charging amount” was not charged fully, go to step 4.
4. Perform the refrigerant charging operation following [Refrigerant charging operation
procedure] as shown in page 189, and charge the remaining refrigerant of the “additional
charging amount”. For performing the refrigerant charging operation the push button on the
PC board (A1P) of outdoor unit (Incase of multi system master unit) are use. (See the figure
32) In addition, the refrigerant are charged from the refrigerant charge port via the valve A.
(See the figure 33)
For operating the push button and opening and closing the valve, follow the work procedure.
Note:
The refrigerant will be charged about 22kg in one hour at outdoor temp. 30°C DB (6kg at 0°C
DB).
If you need to speed up in case of multi system, connect the refrigerant cylinders to each
outdoor unit as shown in the figure 33.
Measuring device
R-410A cylinder
(with siphon)
Charge hose
Liquid side
shutoff valve
Outdoor unit
Refrigerant flow
Field pipings
fig 31
Refrigerant
charg port
Gus side
shutoff valve
shutoff valve
service port
Valve B
Valve C
Valve A
To indoor unit
Outdoor unit
Pipe intake
Inspection door
Inspection door
LED(H1~8P)
Push button
(BS1~5)
Label
"Service Precaution"
EL. COMPO. BOX lid
EL. COMPO. BOX lid
Lift the protruding
part to open the cover
fig 32
:
:
R-410A cylinder
(with siphon)
Measuring
device
Charge hose
valve A
valve C
valve B
Shutoff valve
service port
Gas side
shutoff valve
Liquid side
shutoff valve
Refrigerant
charge port
Outdoor
unit
Outdoor
unit
Field piping
In case of multi system if you need to speedup.
Refrigerant flow
To indoor unit
valve A
Outdoor
unit
fig 33

Содержание

Скачать