Kawasaki KLV1000 (2004) [261/529] Throttle body removal

Kawasaki KLV1000 (2004) [261/529] Throttle body removal
4-60 FI SYSTEM
THROTTLE BODY REMOVAL
Remove the fuel tank. (4-52)
Loosen the respective throttle body clamp screws (air cleaner
side).
Disconnect the *PAIR solenoid valve lead wire coupler, IAP
senor coupler and IAT sensor coupler.
Disconnect the PAIR hoses from the PAIR solenoid valve.
Remove the air cleaner box.
* For E-24 model is operated by the vacuum.
Loosen the respective throttle body clamp screws (intake pipe
side).
Disconnect the various lead wire couplers.
STP sensor
TP sensor/Fuel injector
STVA motor

Содержание

Похожие устройства

Скачать