Omron NYB1E-C13C6 [11/276] Manual information

Omron NYB1E-413K2 [11/276] Manual information
Manual Information
This section provides information about this manual.
Page Structure
The following page structure is used in this manual.
A
B
C
C D
E
F
B
C
H
5 Installation
5 - 3
NY-series User's Manual
(W555)
5-1 Unpack
5
5-1-1 Unpack Procedure
G
5-1
Unpack
This section provides details on how to unpack the Industrial Panel PC.
5-1-1
Unpack Procedure
1 Check the package for damage.
If there is any visible damage:
Take photos of the package and save them.
Inform your supplier immediately.
2 Open the package.
Ensure not to damage the contents.
3 Ensure that all items are present.
Additional Information
Refer to 5-1-2 Items Supplied with the Product
for the items supplied.
Note: This illustration is provided as a sample. It will not literally appear in this manual.
Item Explanation Item Explanation
A Level 1 heading E Special Information
B Level 2 heading F Manual name
C Level 3 heading G Page tab with the number of the main section
D Step in a procedure H Page number
Manual Information
9
NY-series Industrial Box PC Hardware User's Manual (W553)

Содержание

Скачать