Honda CBR929RR [199/488] Page 86

Honda CBR929RR [199/488] Page 86
FUEL SYSTEM (Programmed
Fuel Injection)
Install the new 0-ring onto the cam pulse generator
.
Install the cam pulse generator into the cylinder
head
.
Install and tighten the mounting bolt securely
.
Route the cam pulse generator wire properly, con-
nect the 2P (Natural) connector
.
Install the removed parts in the reverse order of
removal
.
TP SENSOR
INSPECTION
Remove the ECM cover (page 5-89)
.
Disconnect the ECM 22P (Black) and 22P (Light
gray) connectors
.
Check the connector for loose or corroded termi-
nals
.
Connect the ECU test harness between the ECM
and main wire harness
.
TOOLS
:
ECU test harness
~
07YMZ-0010100
(two required)
1
. INPUT VOLTAGE INSPECTION
Turn the ignition switch ON and measure and
record the input voltage at the test harness termi-
nals using a digital multimeter
.
CONNECTION
B5 (+)-B1 (-)
Standard
:
4
.5-5
.5 V
If the measurement is out of specification, check
the following
:
-Loose connection of the ECM multi-connector
-Open circuit in wire harness
I 1 E
a
ENERATOR
2P (NATURAL) CONNECTOR
ECU TEST HARNESS
~
ECM
11
1
~
)
,
OT)T T*TW
®®®®®
®4
•$
E

Содержание

Скачать
Случайные обсуждения