Honda CBR929RR [202/488] Page 89

Honda CBR929RR [202/488] Page 89
Install the bank
Installation is in the reverse order of removal
.
angle sensor with
its 'UP 'mark
Tighten the mounting screws securely
.
facing up
.
ENGINE STOP RELAY
INSPECTION
Disconnect the engine stop relay 4P connector,
remove the engine stop relay
.
Connect the ohmmeter to the engine stop relay con-
nector terminals
.
CONNECTION
:
Red/White-Black/White
Connect the 12V battery to the following engine
stop relay connector terminals
.
CONNECTION
:
Red/Orange
-
Black
There should be continuity only when the 12V
battery is connected
.
If there is no continuity when the 12V battery is
connected, replace the engine stop relay
.
ECM (ENGINE CONTROL MODULE)
SYSTEM INSPECTION
Remove the fuel tank mounting bolts (page 5-61)
.
Remove the bolts and fuel tank rear bracket
.
FUEL SYSTEM (Programmed Fuel Injection)
UP
ENGINE STOP RELAY
ENGINE STOP RELAY
C>
BATTERY
BOLTS
y
5-89

Содержание