Honda CBR929RR [193/488] Screws to the specified torque

Превью страниц Страница 193 / 488
Honda CBR929RR [193/488] Screws to the specified torque
FUEL
SYSTEM
(Programmed
Fuel
Injection)
Install the
three
collars, thrust spring and starter
valve shaft
.
Install the starter valve assembly into the valve
hole
.
Tighten the starter valve lock nut to the specified
torque
.
TORQUE
:
2 N
•m
(0
.18 kgf
.m,
1 .3 Ibf-ft)
No
. 3/4 starter valve
:
Compress the thrust spring and install the No
. 3/4
starter valve arm onto the starter valves
.
Install and tighten the starter valve arm mounting
screws to the specified torque
.
TORQUE
:
1 N-m (0
.09 kgf
.m
,
0
.7 Ibf
.ft)
COLLARS
STARTE=R
\,L
L
~
f
;
~
-
:H RING
I JE
LOCK NUT
~
STA- I ER' /
, i
No
. 3/4 STARTER VALVE
:
1

Содержание

10895