1.11.4 Removal of Horizontal Blade
Warning Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step Procedure Points
1 Remove 4 screws each
(16 screws in total) to
dismount the 4 seal
materials.
2
Remove 2 screws each
(16 screws in total) to
dismount the 8
horizontal blade
bearings.
Reassembling
Q Make sure that the air outlet
insulation material (seal
material) is as shown below
(may result in dew
condensation).
Seal material
Horizontal
blade
bearing
Swing motor
Horizontal blade
Air outlet insulation material
Seal
material
No catching or gap is allowed for
the seal material