Disassembly and Maintenance ESIEN05-04
5–78 Part 5 Disassembly and Maintenance
3
1
55
3 Install the switch box and
the decoration panel.
Q When install the decoration
panel,
be careful not to catch the lead
wire.
4 Insert the lead wire of the
receiver section to
connector X1A, and bind
the two wires with tie
wrap.
5 Set the dip switches.
Q Setting the dip switches
Set the dip switches with same
conditions as those of the
transmission parts box
removed.
(For details of setting, refer to
the instruction manual of
infrared remote control kit.)
6 Mount the transmission
parts box with two screws
after checking that the tie
wrap is in the fixing
position and the lead wire
is caught with fixing part
of tie wrap and can not
come out.
7 Insert the lead wire from
the transmission parts
box to the connector
X24A on indoor unit.
Pass through the lead
wire to be connected to
X24A on the indoor unit
PC board under the
hooking piece.
Step Procedure Points
Tie wrap
X2A
X1A
(S2696)
(S2694)
123
MS
SS2
SS1
(S2702)
X24
(S2703)
Hooking piece