Daikin FAQ100BVV1B [345/381] Removal of drain pump

Daikin FCQ100B7V3B [345/381] Removal of drain pump
ESIEN05-04 Disassembly and Maintenance
Part 5 Disassembly and Maintenance 5–105
3
5
1
5
1.14.6 Removal of Drain Pump
Warning Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step Procedure Points
1 Drain pump is located at
piping side.
Cut clamp material of
hose, and disconnect
hose from pump.
Caution:
When reconnect drain hose with
the pump, secure hose at joint
using clamping material such as
Tielap. (Clamping material should
be normally included in the stock
items.)
2 Remove four screws to
dismount drain pump.
3 Dismount drain pump by
pulling it down.

Содержание

Скачать