Daikin FAQ100BVV1B [308/381] Insert two thermistors

Daikin FAQ71BUV1B [308/381] Insert two thermistors
Disassembly and Maintenance ESIEN05-04
5–68 Part 5 Disassembly and Maintenance
3
1
55
3 Install the heat
exchanger mounting
plate.
4
Insert two thermistors.
Then cover the header by
anti sweat tube.
Q Set the lead wire with yellow
tape (for heating) upper side
while that with no tape (for
liquid) lower side.
5 Reinstall the lead wire of
thermistor and anti sweat
tube on the original
position by using two
pieces of heat resistance
tie wrap.
Heat resistance tie wrap
Parts No.:1278921
(Drg No.:4SA90202-1)
Step Procedure Points
Heat exchanger
mounting plate
(S2681)
(S2682)
Anti sweat tube
(S2673)
Anti sweat tube

Содержание

Скачать