Daikin FAQ100BVV1B [289/381] Removal of horizontal vane

Daikin FUQ100BUV1B [289/381] Removal of horizontal vane
ESIEN05-04 Disassembly and Maintenance
Part 5 Disassembly and Maintenance 5–49
3
5
1
5
1.12.4 Removal of Horizontal Vane
Warning Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step Procedure Points
1 Removing the decoration
panel
Q Refer to the "Removal
of Decoration Panel"
2 Remove the padding at
four corners of frame
fixed with three screws
each. At that time, peel
the end of black sealing
material of discharge port
in part.
Q Peel not the anti-sweat
material but only sealing
material of discharge port.
Note: When restore the
sealing material of
discharge port, be careful
that no clearance exists
between padding and
sealing material as
original installation.
(Otherwise, due dripping
may occur due to leakage
of cool air.)
(S2642)
(S2643)
Anti-sweat material
Sealing material
of discharge port
(S2644)
Padding
Sealing material
of discharge port
Anti-sweat material

Содержание

Скачать