Daikin RXYQ120PYDN [121/405] Electric wiring work and initial setting

Daikin RCXYQ22MAY1 [121/405] Electric wiring work and initial setting
2.2 Di Unit <DEC101A51> 117
ED721208 Adaptor
4
2.2.4 Electric Wiring Work and Initial Setting
1. Electric wiring work
×
×
4
ON
DS6
231
RS1 Low
Group No. Set
0
DS1 High
2413
DS3
5
DS2
8
ON
67
7
ON
2
DS5
3
DS4
46581
M6M3 M4
CA
CM M5
A6
M2 M7 M8
A7A4A3 A8
M1
A5A2A1
TP1
2
H9P
H8P
H1P
H10P
H15P
4
H6P
H14P
H7P
H12P
H2P
H16P
H11P
INPUT
Alarm
Monitor
(RED)
H5P
67
H3P
H13P
3
Operation
Monitor
(GRN)
185
X2A
F2
F1
N
L
X3M
RED
H17P
X1M
YE
RED
AC200V
~240V
GRN
HAP
X2M
X1A
Wiring Lead-In
Clamp
(1) Wire connections and wire clamping should be as shown in the figure above.
(2) No simultaneous clamping is allowed for high-voltage wiring
(power supply wiring (L/N) & earth wiring), low-voltage wiring <Communication wiring (F1/F2), operation input
wiring (CM, M1 to 8) and abnormal input wiring (CA, A1 to 8)> since malfunctioning may result. Also, in case
where the wirings described above are routed in parallel, be sure to connect the wirings at least 50 mm apart
from the other.
To 1 ~ 200 - 240 V
and earth
For wiring connection, remove the front panel (secured with 2 screws) of this equipment.
Upon completion of operation given in this paragraph and "2. Initial Setting" below, close the front panel with the
screws described above.
Clamp
To facility
equipment
To facility
equipment
To terminals F1, F2 of the centralized control
equipment or terminals F1, F2 of other
equipment (outdoor unit, DEC101A51, 102A51)
H4P
×
×
×
×××××××××
×
××××××××

Содержание

Скачать