Nissan Note [921/1872] Power supply and ground circuit

Превью страниц Страница 921 / 1872
Nissan Note [921/1872] Power supply and ground circuit
POWER SUPPLY AND GROUND CIRCUIT
EC-921
[HR (WITH EURO-OBD)]
C
D
E
F
G
H
I
J
K
L
M
A
EC
7. CHECK ECM POWER SUPPLY CIRCUIT-II
1. Reconnect ECM harness connector.
2. Turn ignition switch ON.
3. Check voltage between IPDM E/R terminal 33 and ground with
CONSULT-II or tester.
OK or NG
OK >> Go to EC-1221, "IGNITION SIGNAL" .
NG >> GO TO 8.
8. CHECK ECM POWER SUPPLY CIRCUIT-III
1. Turn ignition switch OFF and wait at least 10 seconds.
2. Turn ignition switch ON and then OFF.
3. Check voltage between ECM terminal 105 and ground with
CONSULT-II or tester.
OK or NG
OK >> GO TO 14.
NG (Battery voltage does not exist.)>>GO TO 9.
NG (Battery voltage exists for more than a few seconds.)>>GO TO
11.
9. CHECK ECM POWER SUPPLY CIRCUIT-IV
1. Turn ignition switch OFF and wait at least 10 seconds.
2. Check voltage between ECM terminal 32 and ground with CON-
SULT-II or tester.
OK or NG
OK >> GO TO 10.
NG >> GO TO 11.
Voltage: Battery voltage
MBIB1353E
Voltage: After turning ignition switch OFF, battery
voltage will exist for a few seconds, then
drop approximately 0V.
PBIB3037E
Voltage: Battery voltage
PBIA9562J

Содержание

9427
Случайные обсуждения