Daikin RZQ125B7W1B Сервис мануал онлайн [283/326] 607212

Daikin RZQ100B7W1B Сервис мануал онлайн [283/326] 607210
ESIE05-03 Field settings
Part 4 Commissioning and Test Run 4–19
3
4
5
1
Possible system
settings
The table below contains the possible system settings, which are displayed on the remote controller if
the TEST button is pushed twice shortly.
Changing the mode
settings
To enter the monitoring level and to change the maintenance mode settings, proceed as follows:
Size
Software
Type
Settings Display Settings Display
35 35
5
FCQ-B FJ
45 45 FHQ HJ
60 63 FAQ AJ
71 71 FFQ GJ
100 100 FBQ JJ
125 125 FUQ 3J
140 140 FCQ-D FJ
200 200 FDQ UJ
250 250
Step Action
1 Hold down the INSPECTION/TEST button for at least 4 s to enter the field setting mode.
2 Hold down the INSPECTION/TEST button for at least 4 s to enter the maintenance mode.
3 Press the TEMPERATURE CONTROL buttons as many times as needed to select the
mode No. you want.
4 Press the TIMER SELECTION button as many times as needed to select the unit No. you
want.
5 Carry out the settings for modes 44 and 45. See “Maintenance Mode Settings” further in
this section.
6 Press the CONFIRMATION button to confirm the settings of modes 44 and 45.
7 Press the INSPECTION/TEST button to return to the normal operating mode.
ESIE05-03.book Page 19 Wednesday, April 6, 2005 4:09 PM

Содержание

Скачать