Daikin EWYQ230DAYN [325/524] Lead time 030s

Daikin EWYQ230DAYN [325/524] Lead time 030s
ESIE06-05 The Digital Controller For Multiscroll Chillers
Part 2 – Functional Description 2–99
3
2
4
5
1
2.15.12 Defrost
This screen allows modification of the defrost start condition and defrost timers.
Settings:
Remark: The selection of NORMAL or SHORT timer can be done in the USER/defrost screens.
This screen allows modification of the defrost lead time.
Settings:
START CONST TEMP : Setting used in the formula to calculate if defrost cycle is
requested.
NORMAL TIMER : Minimum normal time between 2 defrost cycles of the same
circuit.
SHORT TIMER : Minimum short time between 2 defrost cycles of the same
circuit.
_v DEFROST
START CONST TEMP:10 °C
NORMAL TIMER:030m
SHORT TIMER: 10m
LEAD TIME : Time between the actual defrost start and the moment the
defrost start conditions were met.
_ DEFROST
LEAD TIME:030s

Содержание

Скачать