ESIE06-05 Pre-Test Run Checks
Part 4 – Commissioning and Test Run 4–3
3
4
5
1
Part 4
1 Pre-Test Run Checks
1.1 What Is in This Chapter?
Introduction This chapter contains checks you have to carry out before every test run.
Overview This chapter contains the following topics:
Topic See page
1.2–General Checks 4–5
1.3–Water Piping Checks 4–6
1.4–Water Pressure Drop through Evaporator: EWAQ080-100DAYN (N-P-B) 4–11
1.5–Water Pressure Drop through Evaporator: EWAQ130-210DAYN(N-P-B) 4–12
1.6–Water Pressure Drop through Evaporator: EWAQ240-260DAYN (N-P-B) 4–13
1.7–Water Pressure Drop through Evaporator: EWYQ080-100DAYN (N-P-B) 4–14
1.8–Water Pressure Drop through Evaporator: EWYQ130-210DAYN(N-P-B) 4–15
1.9–Water Pressure Drop through Evaporator: EWYQ230-250DAYN(N-P-B) 4–16
1.10–Unit pressure drop : EWAQ080-100DAYNN Standard Model 4–17
1.11–Unit pressure drop : EWAQ130-210DAYNN Standard Model 4–19
1.12–Unit pressure drop : EWAQ240-260DAYNN Standard Model 4–21
1.13–Unit pressure drop : EWYQ080-100DAYNN Standard Unit 4–23
1.14–Unit pressure drop : EWYQ130-210DAYNN Standard Unit 4–25
1.15–Unit pressure drop : EWYQ230-250DAYNN Standard Unit 4–27
1.16–External Static Unit Pressure: EWAQ080-100 DAYN (P-B) 4–29
1.17–External Static Unit Pressure: EWAQ130-210 DAYN (P-B) 4–31
1.18–External Static Unit Pressure: EWAQ240-260DAYN (P-B) 4–32
1.19–External Static Unit Pressure: EWYQ080-100DAYN (P-B) 4–34
1.20–External Static Unit Pressure: EWYQ130-210DAYN (P-B) 4–35
1.21–External Static Unit Pressure: EWYQ230-250DAYN (P-B) 4–36
1.22–External Static Unit Pressure: EWAQ080-100DAYN (OPHP) 4–37
1.23–External Static Unit Pressure: EWAQ130-210DAYN (OPHP) 4–39
1.24–External Static Unit Pressure: EWAQ240-260DAYN (OPHP) 4–40
1.25–External Static Unit Pressure: EWYQ080-100DAYN (OPHP) 4–41
1.26–External Static Unit Pressure: EWYQ130-210DAYN (OPHP) 4–43